How to Specify a Connector for a New Programme: A Spec Checklist

A new programme rarely fails because the connector was difficult to make. It fails because the request that went out for quotation left four or five decisions open, and every supplier filled the gaps differently. By the time samples arrive the housing does not fit the bracket, the seals do not match the wire, and quoting restarts.

A connector specification is not a data sheet. It is the short list of decisions only the harness owner can make, written down before anyone quotes.

What Decisions Belong to You and What Belongs to the Supplier?

You own the application: circuit count, current, mounting position, exposure, programme life and the validation standard that applies. The supplier owns the execution: material grade, tooling, plating ranges, packaging and inspection.

Problems start when the lists blur. A buyer who writes “sealed, IP67” without saying where the connector sits has handed the supplier a decision it cannot make.

Circuit Data: What the Spec Must Carry Before Anything Else

Every other decision follows from the circuit list, so it belongs on page one and deserves the most detail. For each cavity: signal or load type, steady current, inrush behaviour if there is a motor or coil, wire size, and the permitted voltage drop.

Two habits cause most of the rework. The first is sizing by the sum of all currents instead of the worst single circuit plus a realistic multi-circuit derating. The second is listing wire by gauge only. Seals and crimp tooling react to insulation outside diameter, and two wires of the same gauge can need different seals.

Environment: Where Sealing and Temperature Ratings Actually Come From

Sealing is a location decision, not a preference. A connector in the cabin, one in a door grommet, one on the engine and one in a wheel arch see different water, salt and heat, and should not carry the same ingress target. Write the mounting position, then the target rating, then the reason: that sentence settles the argument when a part meets the number but not the intent.

Temperature works the same way. Ambient is half of it; radiant heat from a manifold, self-heating from current in the cavity, and a wash cycle all stack. Chemical exposure matters too: fuel, oil, brake fluid, coolant and washer concentrate attack polymers differently. Our guide to sealed and unsealed connectors covers how far that decision reaches, and the temperature rating article explains why “under-hood” is not one number.

Mechanical Interface: Pin Count, Pitch, Keying and Packaging Space

State the cavity count, pitch, mating direction, cable exit, the envelope it must fit inside, and the retention method: clip, bracket, bolt or panel mount.

Pin count comes from the circuit list, but the housing family follows from it, because shells, seals, terminal position assurance and coding all change together as the count grows. If the circuit list is still moving, choose the family one size up and note that spare ways will be plugged. Our housing range is grouped that way, and this walk-through of shell sizing shows what changes between a two-cavity and a twenty-cavity part.

Two identical connectors within reach of the same hand will eventually be swapped, and keying or colour is cheap now and expensive after release.

Termination and Plating: The Part the Harness Shop Inherits

The connector is half a connection. The spec also has to say how the wire attaches, which terminal series is expected and what plating is acceptable. Tin is the default for signal and light power; silver enters where surface temperature and contact stability under thermal cycling matter more. Mixing the two on one connector is worth an explicit prohibition: a tin-to-silver interface in a damp cavity is a corrosion cell.

Three details are usually missing from first drafts: whether a terminal position assurance device is required and whether it is separate or moulded in; cavity plugs for unused ways, which stop an open cavity becoming a leak path; and the seal part number or insulation diameter range it must cover. The terminal range shows the series available; a representative housing shows how sealing, coding and retention are packaged on one part.

The Spec Sheet: Fields to Fill Before the RFQ

Twelve fields that fit on one page beat a forty-page template nobody reads.

Field What to write What goes wrong if blank
Circuit list Cavity, function, load type Housing family not selectable
Current per circuit Steady current plus inrush Terminals sized on a guess
System voltage 12 V, 24 V or HV, with range Clearance assumptions diverge
Wire range Gauge and insulation OD Seals and tooling chosen blind
Sealing target Rating plus mounting position Meets the number, fails in service
Temperature Ambient, radiant, self-heating Grade picked on ambient alone
Chemical exposure Fluids the part will see Polymer incompatible with one fluid
Envelope and mounting Max size, retention, cable exit Fits electrically, not physically
Keying and colour How adjacent connectors differ Mis-mating during service
Termination Terminal series, plating, TPA Mixed plating on one interface
Validation standard The standard to be satisfied Two suppliers test to two rules
Programme life Years in production, volume Tooling mismatched to volume

What to Send With the Enquiry

Four things make a specification answerable: the spec sheet, a harness drawing or marked-up sketch showing the connector location, a photo of the mating part or the old connector, and the validation standard. For a replacement, add the existing part number and a photo of the housing marking. Send it through our contact page.

Which Mistakes Send a Programme Back to Design?

  • Totalling the current instead of derating for the worst circuit and the loaded cavities.
  • Copying an ingress rating without checking the mounting position.
  • Leaving plating open, then receiving mixed plating from two sources.
  • Using a photograph as a dimensional reference for pitch and cavity spacing.
  • Specifying no keying between two identical connectors on one harness.
  • Forgetting cavity plugs, then chasing a leak that is not a seal failure.
  • Choosing seals by gauge instead of insulation outside diameter.

FAQ

Do I need a full drawing before I can ask for a quotation?

No. A circuit list, current per circuit, wire range, mounting position and a sketch of the envelope are enough to start a technical discussion.

Can a supplier cross-reference a part number I already use?

Usually, provided the original can be identified. Send the number, a photo of the housing marking and the application data. A cross-reference is a proposal against your specification, not a guarantee of interchangeability, so check it field by field.

Who decides the ingress rating?

The application does. Mounting position and fluid exposure set the target, and the supplier proposes a part that meets it. A supplier who offers a rating before asking where the connector sits is guessing.

What if the housing I need is not in any catalogue?

Then the specification matters more, not less. Cavity count, pitch, envelope and retention must be fixed in writing before tooling is discussed.

How detailed should the validation requirement be?

Name the standard and the severity level that applies. If the programme has none of its own, say which parts of a published standard you want covered, so every quotation is measured against one list.